Previous experience in Cairo
   

1. UDC played a key role in paving the way in a scientific technical Manner for Cairo governorates, lands by setting the foundation to the Surveying network tide to the Arab Republic of Egypt’s network and Connecting them internationally to the international system (WGS84), And that is to facilitate establishing and updating of base maps, Surveying works, detection of utilities and its survey editing, and that Would be as follows:

o Establishing of 89 triangular points that meets the density of 1 point per 7km2 with the satellite cadastral surveying GPS system.
o Establishing of a traverse network that comprises the count of (1004) Points in the area of Cairo governorate.
o Establishing benchmarks network in the area of Cairo governorate that is connected to the highly accurate bench marks network of the Republic.

Within Cairo governorate
2-1 The second line of the underground Metro and the appreciation of the French side on the accuracy of the map.
2-2 6th October Bridge.
2-3 Contribution to investment projects, such as the underground Garages illustrating all the underground utilities.
2-4 the stages of planning, executing and following up cars' tunnels (Al- Azhar and Opera tunnels – Youssef Abbas, Salah Salem tunnels – Athawra tunnel ) .
2-5 Expansion of all cars, and pedestrian tunnels.
2-6 The regional central control network for the Electricity Authority in Egypt (fiber optics ) with a length of (290 ) km in Greater Cairo.
2-7 Telephone cabins project on the streets and the squares (Menatel – Nile ).
2-8 Surveying database& utilities for all Arab Organization of Industries, buildings.
2-9 Axis development projects (Autostorad – Gisr El suez – Hikestep – Alouruba – Corniche El Nil ).
2-10 Accurate calculation of utilities services in random areas.
2-11 Rain water drainage axes on the scale of (9) axes in Cairo.
2-12 All planned and implemented utilities projects (water, sewerage, gas, electricity, petroleum, telephones) in Cairo and that’s through supplying the utilities and the projects with the necessary maps.
2-13 Participation in the execution of project of the mustard-haykesteb gas pipeline in cooperation with petroleum companies and the execution of surveying works.
2-14 survey and utilities detection for external works relative to Cairo airport’s terminal (3) in favor of the Arab contractors company.
2-15 Survey works for A .R .E Territories on the level of Cairo Governorate.
2-16 Survey works & utilities detection for Suez Road development from K.M 4.5 till the Ring Road & establishing El Geish bridge.
2-17 Utilities detection & following up digging works for establishing Ismailia Road bridge in front of 10th of Ramadan station & Ring Road tunnel.
2-18 Survey works for schools, hospitals & poultry farms project inside & outside Cairo to produce surveying maps to control H1N1 & Poultry Influenza.
2-19 Survey works project for agricultural areas inside Cairo Governorate & producing maps for them.
2-20 Survey works & utilities detection project for Ring Road around Greater Cairo Governorates.
2-21 Survey works & utilities detection & longitude leveling for petroleum line Mostorod – Haykesteb with length 27 K.M.